Engineer
You certify a building's work: what each stage done is worth, on your own photos taken on site. You price the variations the Board orders and sign the daily sheets for dayworks. You never run the build and never record a payment.
- Works on
- The console's Building tab (with Settings and Guides), and a phone on site
- Signs in with
- An emailed link or Google in the console; your name and a PIN on the phone
- Records
- Hold point photos, variation prices, signed daily sheets and certificates
- Added by
- The Board, on a building holding only
Your role
A building on Plain Ledger's Construction module keeps three people apart: the Board contracts and approves payments, the office records the payments, and you certify the work. A contractor is never paid more than your certificates leave payable, so your certificate is what the money rests on. The Board appoints a registered engineer, architect or quantity surveyor for it.
For that reason you are never the build's manager, on its forum or on its Board: the app refuses to give you the Engineer role if you hold one of those roles there, and an engineer who later holds one certifies nothing. Nor do you certify or price the work of a contractor in which you have declared an interest. You see the Building tab, without its money, and your own Settings; nothing else of the holding.
Getting access
- The Board adds you on People with your email address, the Engineer role and a PIN for the phone. You are emailed how to sign in.
- In the console, type your address and press Email me a sign-in link, or Continue with Google. An engineer needs no authenticator code.
- On site, use a phone set up for the build: the manager sets it up once with a code from Add a phone on the Phones tab. On Who is recording?, press your name, enter your PIN and press Start.
The role runs for as long as the Board gave it, three years at most. Ask the Board to renew it if the build runs longer.
On site: photographing hold points
A hold point is work the next stage covers up: the trenches before the concrete, the steel before the pour, the trusses before the sheets. It is photographed before it is covered, because that is where a build is cheated.
- On the phone, open Photograph a hold point and choose the stage. Its hold point says what to photograph.
- Stand on site and take the photo, close enough to see the work. Put a tape in the shot where depth or size matters.
- Add a note if it helps, and press Save. One photo is one record: take each further photo the same way.
- The phone writes where the photo was taken into the photo itself. A photo taken outside the site's outline does not count towards the stage.
- On the phone you only photograph. Materials issued to a stage and the store's count are recorded by the site's people, never by you.
Variations and dayworks
- The Board orders a variation before the work, naming the stage and whether it is paid as a lump sum or as dayworks.
- On Building, under the variations, press Price it and give its price (for dayworks, the most the daily sheets may come to). The Board then approves it.
- For dayworks, use Sign a daily sheet for each day's work: the day, the work done and its amount. Only signed sheets count, up to the price. A signature cannot be taken back.
Making a certificate
- On Building, open Make a certificate and choose the kind: Interim, Practical completion or Final.
- Enter what each stage's work done since the last certificate is worth. The form shows what is left to certify on each stage, and what the certificate will hold back and release.
- Check the preview (worth, retention held, released, payable) and save.
- A stage is certified only on your own photos taken on site. A stage with a hold point also needs a photo of it taken on site before the next stage started.
- Work beyond a stage's budget needs an approved variation first. Each stage appears once in a certificate.
- The certificate holds the contract's retention and recovers any advance. Practical completion, certified once, releases half the retention held. The Final certificate follows it, at the end of the defects period, and releases the rest; nothing is certified after it.
- A certificate cannot be changed. A correction is a later certificate.
What you can and cannot do
You can
- Photograph hold points on site from the phone
- Price variations and sign daily sheets for dayworks
- Make interim, practical completion and final certificates
You cannot
- Record or approve a payment, or see the build's money
- Record contracts, stages, advances or materials
- Download the verification bundle (the Board, the manager and the auditor do)
Getting help
- The ? on the Building tab, and on the phone's hold point screen, opens its help page, in English and French.
- See Building for how the whole build is run, and ask the Board for a variation to price or for your role to be renewed.