crop guide

Cabbage

Cabbage is a seasonal crop, about 100 days from sowing the nursery to the last cut — the shortest of the vegetables here. Each season is a block on a plot, counted in plants (about 40,000 a hectare) and hectares, harvested as cabbages by grade, and costed per hectare and per kg.

Kind
Crop
Calendar
6 steps
Recorded on
The phone
Reviewed in
The console and the weekly flash

What the platform gives you

FeatureWhat it does for youWhere
Blocks and plotsA season is a block on a plot: its hectares, its planting date and its stage. About 40,000 plants a hectare.Phone Planting; console Crop blocks
Stand countCount the plants standing against what was planted. More than 10% short raises an exception for the manager.Phone Stand count
The field calendar6 steps by days from planting, from the template below; overdue work appears on Today.Console Herd > Health schedules
Harvest by gradeWeighed or counted into a store, grade by grade; 20,000-50,000 kg a hectare is usual.Phone Harvest
CostsSeed, fertiliser, sprays, labour and a share of the farm's shared costs, per hectare and per kg, for the season.Console Costs
Diamondback moth is scouted weekly, not sprayed to a calendarThe day-40 step repeats every seven days and it is a watch: this pest resists a fixed spray programme, so a farm that sprays to the calendar trains the resistance and then has nothing left that works. The weekly record is the evidence of what was actually seen, which is what lets a spray be justified when one is needed — and on a hundred-day crop the scouting round runs for most of the season.Phone Field work; the Today list
Cut only the firm heads; the rest fill inFrom day 90, with a fortnight's window, and a block gives several Harvest records as it is cut over. But unlike tomato and pepper it still ends at Mature rather than staying in a picking stage: the plants are not producing again, they are finishing at different speeds. So the first cut reads low against what the crop expects, and the block is judged only once the last firm head is off it.Phone Harvest

The schedule of activities

The calendar the platform ships for this crop, by days from planting. A farm sets its own with its agronomist in the console (Herd, Health schedules); the values here are typical and are for the agronomist to review. Steps appear on the phones' Today list.

WhenActivityRecorded asWho
Day 0 (3-day window)Sow the nurseryPlanting; Field workWorker
Day 28 (7-day window)TransplantPlanting; Field workWorker
Day 40 (7-day window)Diamondback moth watch — scout weekly; it resists a sprayed-to-a-calendar programme (every 7 days)Field workWorker
Day 55 (10-day window)Top-dressing at headingField workWorker
Day 60 (10-day window)Earth up the rowsField workWorker
Day 90 (14-day window)Cut as heads firm — cut only the firm heads; the rest fill in (every 7 days)HarvestWorker

Who does what

WorkerPhone
Records the planting, every field work step, the stand counts and each harvest on the day, in the field. Workers do not sell.
ManagerPhone and console
Sets the block's calendar; explains the exceptions; asks the Board to approve each sale and records it once approved.
BoardConsole
Approves every sale before it happens; reads the weekly flash and the monthly pack.
Management forumConsole
Sees the week's figures and the manager's exceptions; resolves what is theirs.
Support EngineerConsole
Keeps the phones enrolled and syncing. Sees no records unless the farm grants it.

Signing in. Workers use the phone app with a name and a PIN. Everyone else signs in to the console with an emailed link or Google; the Board, Support and the Auditor add a six-digit code.

What the weekly flash says about this crop

For cabbage it gives the crop's Crop blocks and hectares, what was planted and harvested this week, and its field work done, overdue and due. The line to read is the diamondback moth watch, because it is weekly and it runs from day 40 to the last cut: done should show one round for every block, every week, and a block missing from that count is a block nobody looked inside. Expect two or three harvest lines against one block as it is cut over, so the week's figure is a cut and not a season. Yield a hectare settles against the 20,000 to 50,000 kg the crop expects once the last head is off.

Weekly runbook

MondayMON

WorkerWalk each block; open a few hearts and look — diamondback moth works inside the head where nothing on the outside shows it
ManagerRead the weekly flash and the Today list; plan the week's Field work
Board and othersBoard reads the weekly flash

TuesdayTUE

WorkerTransplant where a nursery is about 28 days old
ManagerIssue seed, fertiliser and sprays from the store with their rate a hectare

WednesdayWED

WorkerDiamondback moth watch on every block from day 40, every week; top-dressing at heading at day 55 and earthing up the rows at day 60
ManagerDecide a spray on what the scouting found, not on the date — and check its pre-harvest interval against the first cut

ThursdayTHU

WorkerStand count where due; record what was lost and why
ManagerClear Field work overdue and Stand count short

FridayFRI

WorkerIn season: cut the firm heads only, weigh by grade into the store, and leave the soft ones standing
ManagerRecord the sales the Board approved; price deliveries in Money

SaturdaySAT

WorkerCatch-up field work; a second cut where a block has firmed up

SundaySUN

WorkerRest

Every month and every season

In the last days of the month, count every store holding seed, fertiliser, sprays or heads against the record, settle any difference as a loss or a find, and close the month. Price every delivery in Money so the crop's costs are complete. On a hundred-day crop the whole season fits inside three monthly closes and the comparison comes round three times a year, so what one season showed can be acted on in the next. At season end the block's yield a hectare and its cost a kg appear in Costs beside the 20,000 to 50,000 kg a hectare the crop expects, every cut counted together.

Exceptions to watch

ExceptionRaised whenCleared by
Stand count shortthe plants counted are short of what was planted, beyond the crop's tolerancea replant, or the manager's note
Field work overduea calendar step passed its windowrecording the work, or the manager
Low yieldthe harvest is below what the crop expects a hectarethe manager, who writes what happened
Count does not matcha store count differs from the recorda loss or a find, or the manager's note

Good to know

Cabbage's season is 100 days: nursery at day 0, transplant at 28, the diamondback moth watch from 40 and every week after, top-dressing at heading at 55, earthing up the rows at 60, and cutting from day 90 with a fortnight's window. The scouting is the part worth understanding rather than simply doing. Diamondback moth develops resistance quickly, so a programme sprayed to a fixed calendar stops working within a season or two and leaves a farm with no product that bites; scouting weekly and spraying only on what was found is slower to organise and is the only approach that keeps working. Open a few hearts when you scout, because the pest works inside the head where the outside shows nothing. Earthing up the rows at day 60 holds a heading plant upright and keeps the lower leaves off wet soil. Cut only the firm heads and leave the rest: a block firms unevenly and the soft ones fill in over the following fortnight, so several cuts make one season's yield — but the block still ends at Mature, since those plants are finishing rather than producing again. Like tomato, pepper and onion, cabbage is raised in a nursery and transplanted. The 40,000 plants a hectare, the 10% stand tolerance and the 20,000 to 50,000 kg a hectare are typical values shipped with the platform; the farm's agronomist replaces them in a new version of the definition.

Top