Mango
Mango is a perennial: a grafted tree carries a first small crop in its third or fourth year, a full one from about its fifth, and then bears for thirty years or more. A block is not a season but a standing asset — about 150 trees a hectare, 5,000 to 20,000 kg of fruit a hectare once it is bearing, picked by class into the store, and costed per hectare while it grows and per kg once it bears.
- Kind
- Crop
- Calendar
- 5 steps
- Recorded on
- The phone
- Reviewed in
- The console and the weekly flash
What the platform gives you
| Feature | What it does for you | Where |
|---|---|---|
| Blocks and plots | A season is a block on a plot: its hectares, its planting date and its stage. About 150 plants a hectare. | Phone Planting; console Crop blocks |
| Stand count | Count the plants standing against what was planted. More than 3% short raises an exception for the manager. | Phone Stand count |
| The field calendar | 5 steps by days from planting, from the template below; overdue work appears on Today. | Console Herd > Health schedules |
| Harvest by grade | Weighed or counted into a store, grade by grade; 5,000-20,000 kg a hectare is usual. | Phone Harvest |
| Costs | Seed, fertiliser, sprays, labour and a share of the farm's shared costs, per hectare and per kg, for the season. | Console Costs |
| Fruit fly sanitation is a round that comes back, and the orchard floor is the whole of it | Day 540, then every 182 days: hang and rebait the traps, and pick up and bury every fallen fruit. The maggots in a dropped mango are the next generation of flies, so the ground under the tree is the control and the traps only tell you how bad it already is. A round skipped leaves nothing visible on the tree — the block looks well right up to the moment fruit is cut open at the packhouse and a whole consignment goes to Rejects, which is why this step is recorded as work done rather than assumed. | Phone Field work; the Today list |
| The nursery is a second product, counted one plant at a time | A nursery bed is a block at Nursery, and its harvest is not weighed: seedlings are lifted, counted and graded Ready to plant. They go into the store, where they are either sold or planted into the farm's own blocks at what they cost to raise — which is how a replanted hectare carries a real establishment cost instead of appearing to have been free. | Phone Harvest (lift the seedlings); Planting |
The schedule of activities
The calendar the platform ships for this crop, by days from planting. A farm sets its own with its agronomist in the console (Herd, Health schedules); the values here are typical and are for the agronomist to review. Steps appear on the phones' Today list.
| When | Activity | Recorded as | Who |
|---|---|---|---|
| Day 90 (30-day window) | Fertiliser round — split between the rains (every 182 days) | Field work | Worker |
| Day 365 (60-day window) | Formation pruning — three or four main branches, open centre | Field work | Worker |
| Day 540 (30-day window) | Fruit fly traps and sanitation — pick up and bury every fallen fruit (every 182 days) | Field work | Worker |
| Day 730 (30-day window) | Anthracnose at flowering — spray at bud break, again at fruit set (every 365 days) | Field work | Worker |
| Day 1095 (60-day window) | Maintenance pruning after harvest (every 365 days) | Field work | Worker |
Who does what
Signing in. Workers use the phone app with a name and a PIN. Everyone else signs in to the console with an emailed link or Google; the Board, Support and the Auditor add a six-digit code.
What the weekly flash says about this crop
For mango it gives the crop's Crop blocks and hectares, what was planted and harvested this week, and its field work done, overdue and due — but it is read differently from a seasonal crop's. Most of the farm's mango hectares are correctly showing no harvest at all: a block spends three or four years at Immature, where hectares and costs accumulate and nothing comes off, and that is the plan rather than a missing record. What deserves the manager's eye is the fruit fly round on any bearing block, because a round postponed is a generation bred rather than a job moved, and the anthracnose line at flowering, which for the fortnight it is open is worth more than the fruit it protects. Yield a hectare appears beside the 5,000 to 20,000 kg the crop expects, and only for the blocks that are Bearing.
Weekly runbook
MondayMON
TuesdayTUE
WednesdayWED
ThursdayTHU
FridayFRI
SaturdaySAT
SundaySUN
Every month and every season
In the last days of the month, count every store holding fertiliser, sprays, seedlings or fruit against the record (Count a store), settle any difference as a loss or a find, price every delivery in Money, and close the month in Periods. Then read two figures that matter more on a tree than a monthly one. The first is the cost a hectare of a block that is not bearing: three or four years of fertiliser, pruning, weeding and water carried before a kilo is sold, which is the number to have in hand before planting the next hectare. The second is the bearing year rather than the bearing month — mango comes in over a few weeks, so one month's kilos a hectare says nothing, and the figure to set against the 5,000 to 20,000 kg the crop expects is the whole year's, with that year's fruit fly and anthracnose rounds beside it. Count each block's stand at least once a year: 3% of 150 trees is four or five, so a single short row is already an exception.
Exceptions to watch
| Exception | Raised when | Cleared by |
|---|---|---|
| Stand count short | the plants counted are short of what was planted, beyond the crop's tolerance | a replant, or the manager's note |
| Field work overdue | a calendar step passed its window | recording the work, or the manager |
| Stand count due | a year has passed since the block was last counted, or since it came onto the record | counting the plants |
| Low yield | the harvest is below what the crop expects a hectare | the manager, who writes what happened |
| Count does not match | a store count differs from the record | a loss or a find, or the manager's note |
Good to know
Mango's calendar is days from planting with rounds that come back rather than a season: the fertiliser round from day 90 every 182 days, formation pruning at a year, the fruit fly round from day 540 every 182 days, the anthracnose spray at flowering from day 730 every year, and maintenance pruning after harvest from day 1,095 every year. Prune for an open centre: three or four main branches with light reaching the middle of the tree is what makes the spraying worth doing, because a closed canopy holds fruit, leaves and wet air together and that is the anthracnose's own weather. The fruit fly is swept more than it is sprayed — pick up every dropped fruit on every round and bury it deep enough that nothing crawls back out, since one rotting mango left under a tree will restock the orchard. Anthracnose is a two-pass job, at bud break and again at fruit set, and it shows as black speckling on the skin weeks later in the store or the packhouse, so by the time the symptom is visible the decision that caused it is two months old. The 3% stand tolerance on 150 trees a hectare is tight by design — a tree is a decade of investment and losing one is not losing a plant — so record a loss under Losses or end the day it is seen rather than at the next count. On a farm keeping animals too, the pruning labour, the sprays and the fertiliser all reach the cost a kg through the crops' share of shared costs (costing.crop_share_pct). The 150 trees a hectare, the 3% stand tolerance and the 5,000 to 20,000 kg a hectare are typical values shipped with the platform; the farm's agronomist replaces them in a new version of the definition.